
Hello!
Member Center
VIP User Benefits
选择省份
applications:control unit with integrated fuse (max. 4 A) must be provided to activate the ignition transformers.enviromental temp:-20-60°c Installation: be installed in the enclosure with connection port facing down to prevent interference with external devices. Ingition calbe: recommended <1 m max. 5m."
Q:How long is the recommended ignition cable length?
A:Maximum 5 meters at the recommended minimum voltage level
版权所有©2022 岱坤燃控-燃烧及热能配件工业品平台 沪ICP备12043892号-6